Migrations & Upgrades

Moves measured in minutes of downtime

Version upgrades, platform migrations, and data center exits for Oracle Database and E-Business Suite — engineered around the downtime window the business can actually accept.

What We Migrate

Every kind of Oracle move, one methodology

Different sources and targets, same discipline: baseline, rehearse, cut over inside the agreed window, and keep rollback armed until sign-off.

Version Upgrades

11g and 12c estates brought to 19c or 23ai with optimizer regression testing, SQL plan baseline capture, and fallback via guaranteed restore points — so the new version has to prove itself.

19c23aiPlan Stability

Multitenant Conversion

Non-CDB to PDB conversions ahead of Oracle's multitenant-only future — service names, wallets, client connectivity, and application compatibility handled as part of the move.

CDB / PDB23ai-Ready

Cross-Platform Moves

Endian-aware migrations between operating systems and hardware using transportable tablespaces and RMAN duplication, with full checksum validation between source and target.

XTTSRMANExadata

EBS Migrations

Combined application and database moves: 12.1 to 12.2 upgrades, app-tier re-platforms, and integration endpoint cutovers coordinated as a single runbook — not three separate projects.

12.1 → 12.2App Tier

Data Center Exits

Hardware refresh, colocation exits, and storage migrations timed against contract deadlines — with target capacity sized from real workload data, not vendor guesswork.

Colo ExitHardware Refresh

Near-Zero Downtime

Data Guard switchover-based moves and GoldenGate replication that shrink cutover windows from hours to minutes — built for operations that never really close.

Data GuardGoldenGate
How We De-Risk

The migration is decided before cutover night

By the time production moves, we've already done it several times against clones. Cutover night should be the least interesting night of the project.

Scope Your Migration
/01

Baseline

Performance statistics, execution plans, interface inventories, and batch timings captured up front — the target must beat these numbers, not vibes.

/02

Rehearse

Full dry runs against cloned environments, timed to the minute and repeated until the runbook is boring. Every surprise gets found here, not in production.

/03

Cut Over

Go/no-go gates, a minute-by-minute runbook with named owners, and a rollback path that stays armed until validation passes.

/04

Prove

Post-move validation suite, performance comparison against the baseline, and hypercare through the first month-end close on the new platform.